Valencia is a major Mediterranean cruise destination and an important Spanish passenger port. For the 2026 season, Valenciaport identifies two cruise berths beside the TRASMED passenger terminal: Muelle Transversal and Muelle Poniente.
Where cruise ships dock in Valencia
The current cruise berths are located at the northern entrance to the port, in the area closest to the city and outside the restricted commercial-port zone. Valenciaport states that the two 2026 berths serve cruise vessels under 300 metres in length.
The port's former northern-extension cruise berths, Cruceros Uno and Cruceros Dos, have been removed from cruise allocation as port development progresses. Valenciaport's 2026 call-confirmation procedure also states that Dique del Este and Levante are unavailable for cruise traffic during the 2026 campaign.
TRASMED passenger terminal
The TRASMED passenger terminal supports cruise passenger operations alongside its regular ferry activity. Public city-bus connections are only a few minutes' walk from the cruise facilities, while taxis, transfers and excursion coaches provide access to Valencia and destinations across the region.
Getting into Valencia
Unlike Cádiz or Lisbon, Valencia's cruise terminal is not directly beside the historic centre. Passengers normally use a shuttle, local bus, taxi or excursion transport to reach the main sightseeing districts.
Popular destinations include the City of Arts and Sciences, the historic centre, Valencia Cathedral, Central Market, La Lonja de la Seda and the Turia Gardens. Valencia's beaches and maritime neighbourhoods are considerably closer to the port.
Current berth capability
Valenciaport's current cruise page identifies Transversal and Poniente as the two cruise berths for 2026 and specifies vessels under 300 metres LOA. Earlier official technical material lists depths of approximately 10.5 metres at the Transversal berth and 11 metres at Poniente. Because port works and berth arrangements evolve, those depth figures should be confirmed directly with the Port Authority for operational planning.
Shore power and future development
Valenciaport is carrying out a major OPS shore-power programme for container, ferry and cruise vessels. An OPS installation project has specifically been awarded for Transversal de Costa, while the wider programme continues through 2028. Deck7 therefore records shore power at the current cruise facilities as planned unless call-specific operational availability is confirmed.
A new public passenger terminal is also being developed in the former Unión Naval area. Official plans require at least four berths, including capacity for one cruise ship of 360 metres and another vessel of at least 250 metres. All planned berths are intended to have electrical shore supply. Deck7 lists this separately as future infrastructure so its capabilities are not confused with the operational 2026 cruise berths.